PRODUCTION FACILITY

GULF BIOTECH PRODUCTION FACILITY INTRODUCTION

Gulf Biotech has a selected Market for Vial, Ampoules and Syringes in the MENA Region. There is a strong market potential, A total Plot area of 16000 m2. Build up on 20,000m2. There are a number of 3 floors for production, 5 floors for utilities and fix production lines in total. Main suppliers and Contractors of GBC are Rieckerman (Germany), Plant Designer, whereas machines for vial filling, water purification, insulin/ solution manufacturing, autoclaves, and inspection line are installed by Bosch (Germany).   Gulf Biotech has strong values that define our culture and help us execute the strategy in line with our mission and vision.